At most trade shows, the stand shows your product. At Integrated Systems Europe 2027, the stand is your product demo. ISE runs from 2 to 5 February 2027 at Fira de Barcelona, Gran Via, and it presents itself as the world’s largest AV and systems integration show. It is organised by Integrated Systems Events, a joint venture of AVIXA and CEDIA.
Start with the brief, not the render
Write the answers down. They decide how much floor goes to demos, how much to meetings and how much equipment needs power. Our guide on how to brief a stand builder, with a free RFQ template gives you a ready list to send.
Plan the stand in four zones
- Demo. The hero system, running and visible from the aisle.
- Try. Hands-on stations where visitors control the product themselves.
- Talk. A quieter area where a buyer can sit and discuss a project.
- Tech.A lockable back-of-house space for racks, spare equipment, cables and staff items, with ventilation for anything that runs hot.
Let each screen do one job
Our audio-visual services cover LED video walls, display monitors, interactive touchscreens, sound and lighting, with technical support on site.
Control the sound
- Use directional speakers instead of room-filling sound.
- Offer headphones at hands-on stations, so visitors can listen without turning up the volume for the whole hall.
- Give your loudest demo its own enclosed space, if the product needs it.
- Keep the meeting area on the far side of the stand from the loudest corner.
Add interactive touches that earn their place
- A live control demo. A touch panel that changes lighting, display and audio, so visitors see the system respond.
- A before-and-after. The same space with and without your system.
- A sandbox mode. A guided demo with sample data, so visitors can test software without risking anything real.
- A QR code at every station. It lets visitors request a spec sheet, a price list or a follow-up demo.
- Short scheduled demos. A demo every so often gives people a reason to stop and your team a rhythm.
Light the stand without ruining the screens
Good lighting makes hardware look good and keeps screens readable. Aim accent light at products and controls, angle spotlights away from displays, and avoid placing a screen directly opposite a strong light source. Glare ruins a demo faster than anything else. Our guide to exhibition stand lighting design and LED screens explains light layers, glare and brightness in more detail.
Plan power, network and cables early
This is where a custom exhibition stand helps most. Cable channels, equipment rooms and screen supports can be built into the structure instead of added afterwards.
Give business a private space
Build locally and plan for the crowd
A good demo draws a crowd. Leave room around it for people to stand and watch without blocking the aisle, and keep the queue away from the entrance. An exhibition stand builder in Barcelona already knows the venue, the loading routes and how installation works at Fira Gran Via, which matters when build-up time is tight.
Timing for ISE 2027
ISE opens on 2 February 2027. Following the booking timeline, the ideal window for a fully custom stand ran from the start of August to the start of October 2026, and a modular build can be started between about 10 November and 8 December 2026. Our guide on how early to book an exhibition stand builder explains the timeline in full. If you have not started, speak to a builder now to find out what is still realistic.
Mistakes to avoid
- Too many screens competing for attention.
- A demo that only the presenter can run.
- Sound that spills into the meeting area.
- No plan for power, network and cables.
- No quiet place to talk.
A quick brief checklist
- Your main goal and your target visitors.
- The one system you want to lead with.
- Your stand size, position and open sides.
- How many live demos you will run.
- Your power, network and screen needs.
- Your budget range and key dates.