Barcelona draws exhibitors from technology, healthcare, food and drink, manufacturing, automotive and more, so choosing the right exhibition stand builder in Barcelona is a big part of your preparation. But before you finalise a design there is another decision worth understanding: the venue.
Fira Gran Via vs Fira Montjuïc
| Factor | Fira Gran Via | Fira Montjuïc |
|---|---|---|
| Setting | Modern complex | Historic, central |
| Space | About 240,000 sqm | About 153,000 sqm |
| Stand Focus | Technology, demos, large displays | Product presentation, hospitality |
| 2027 Examples | ISE, MWC | Barcelona Wine Week |
Rules and approvals at Fira Barcelona
- Height and structure: this depends on the venue, hall, space and event rules. Gran Via's regulations generally allow construction up to five metres where the hall dimensions permit, with lower limits in some spots. Anything above the limits needs extra documentation and approval.
- Fire safety: materials, wall finishes, decor and hanging fabrics must meet fire requirements, and the venue may ask for certificates.
- Electrics: lighting, screens and demo equipment must follow the venue's technical rules, so plan power and connections before installation.
- Rigging: suspended structures follow the venue's rigging rules, and Fira Barcelona provides rigging through its authorised provider, so do not assume you can attach to the ceiling yourself.
- Electrical layouts and power needs
- Build-up safety: contractors follow venue access, accreditation and construction-site safety requirements.
A double-decker stand or any raised structure needs even more care: expect structural calculations, technical drawings, stability documents and prior authorisation. Raise these during design, not once the stand reaches the venue.
Costs and logistics from Poland
- Stand size and number of open sides
- Stand type: custom, modular or double-decker
- Materials, lighting and furniture
- Transport from Poland, including volume, weight, schedule and venue access
- Installation and dismantling crews and working hours
- Extra venue services such as electricity, internet, water, rigging and AV
When to start planning
- 4 to 6 months before: brief and first consultation
- 3 to 5 months before: concept and 3D design
- 2 to 4 months before: revisions and approvals
- 1 to 3 months before: production
- Before build-up: transport and installation planning
Barcelona fairs in 2027
Several of the business exhibitions in Barcelona land close together in early 2027, so plan production, transport and installation separately for each venue.
ISE 2027 (2 to 5 February, Fira Gran Via). The big AV and systems integration show, with digital signage, smart buildings and pro AV. Stands usually need interactive demos, large screens, product areas and meeting space, and an audiovisual stand for ISE works best when cabling, power and viewing angles are planned from day one.
Barcelona Wine Week 2027 (8 to 10 February, Fira Montjuïc). Wineries, producers, distributors and buyers. Think display counters, tasting areas, bottle storage, seating, meeting tables and clear brand storytelling.
MWC Barcelona 2027 (1 to 4 March, Fira Gran Via). Mobile technology, connectivity and AI. Stands need demo areas, large-format branding, private meeting space and clear visitor flow, since visitors compare many exhibitors quickly. MWC also plans to use more locations around Barcelona in 2027, so check your assigned venue.
Why choose AARS Worldwide
- More than 20 years of experience at European exhibitions
- Custom, modular, double-decker and country pavilion stands
- 3D design so you can review layout and branding before production
- Production, logistics, installation and dismantling through one team, with in-house manufacturing and offices across Europe